Reedsport Highwater Cafe Parking
From Groundwork to Grade: Complete Site Infrastructure
The Rest Of The Year
Jobs this size are the ones people see. Most weeks we are on driveways, house pads and wet yards around Coos County.




The Work
For the Highwater Cafe parking project, we handled the critical "under-the-hood" development required to transform the site into a functional commercial space. Our team managed the comprehensive site preparation, performing precise earthwork to bring the area to subgrade. A major focus of this project was the installation of essential utility networks, including a robust storm sewer system and underground electrical utilities. We also performed the precision trenching and installation of a commercial-grade backflow prevention device to ensure long-term system integrity. By delivering a perfectly graded site and fully integrated utility lines, we provided the solid foundation necessary for the final paving and finishing touches.
The Challenge
Coordinating multiple utility layers within a tight commercial footprint.
Our Solution
Precise trenching and subgrade management to robust infrastructure.
More Work We Do

Coos Bay Home, Garage & ADU Build Pads
Woods cleared, cut to grade, compacted pads for a house, garage and ADU, and 400 ft of french drain
View Project
Gravel Driveway Build
Loose sand access cut, shaped and crowned, then asphalt chips laid and packed down
View ProjectSite Prep Slope Stabilization
Heavy-duty slope stabilization with armor rock
View Project